Sunday 9 February 2020

Completing the frame



The frame was moved from the back of the truck onto the scaffolding base for completion off a level base. 


Central floor support added and underside painted


Frame turned over and first corner post being positioned


Positioning the roof support frame work onto the corner posts. Small sections of steel were welded at the underside of the roof frame at each corner. These dropped into the top of the corner posts and simplified the positioning job (by one man).

Roof frame in position 

No comments:

Post a Comment